Project Performance
Project Search
-
Trade:Civil Architecture
An annual:2013In
The project has a construction area of 17,000 square meters.The construction includes civil building, mechanical and electrical installation, air conditioning, fire fighting and decoration. -
Project Name:Installation of Annual Output 200,000 Cubic Meter MDF Panel Production Line for Indonesia ADR GroupTrade:Wood-based Panel Project
An annual:2012In
For the installation of annual output 200,000 cubic meter MDF panel production line for Indonesia ADR Group, the main equipments are imported from Germany and the auxiliary facilities are from China.




